Checking heating schedules after the clocks change
Compare the programme with the displayed time
Confirm the displayed time and whether your control changes it automatically. A heating period that appears an hour early or late may reflect the clock rather than an appliance fault.
Check whether time changes are automatic
Consult the guide for the specific controller before making a manual adjustment. If automatic time setting is enabled, changing the clock independently may create confusion. Check hot-water schedules as well as room heating where both are programmed.
Observe the next scheduled period
After adjustment, observe the next scheduled period and confirm the household's intended routine. Keep a note of any device that needs manual attention at future clock changes. If the clock repeatedly loses time or settings, report that as a separate symptom. Replacing the boiler is not the first conclusion to draw from a programme that is simply operating against the wrong time.
Details to prepare before the appointment
- The controller model and current displayed time.
- Whether its user guide describes automatic or manual clock changes.
- The intended heating and hot-water schedules, where applicable.
- Whether time or settings are repeatedly lost rather than changed only once.
Arrange the appropriate next step
Describe the timing problem and controller model when seeking controls support. If the device repeatedly loses settings, explain that separately so the required assessment can be agreed.
Related Local Gas London service: heating controls installation.
Further reading: Worcester Bosch: controls explained.
Your home. Your local team.
At Local Gas, we make it simple. Simply great service at great prices.
Greater London & South East Counties


Find your local team
Start typing your service address or Enter your postcode and click Find Address to start your personalised service.
Manufacturers
- Worcester Bosch
- Vaillant
- Viessmann
- Ideal Heating
- Baxi
- Glow-worm