Can an electric shower be moved during bathroom retiling?

Plan shower relocation before retiling

Treat relocation as a planned installation and involve an appropriate installer before tiles are removed or replaced. The proposed water and electrical arrangement needs assessment.

Coordinate the installer and finishing trades

Mark the intended position on a bathroom drawing and explain which finishes will change. Ask which trades must attend and in what order. Do not allow the tiling schedule to determine an unchecked appliance location or leave reconnection assumed at the end of the project.

Discuss the appropriate next step

Provide the intended shower position and bathroom work schedule before tiles are changed. Ask for the installation sequence and trade responsibilities to be agreed.

To check availability, enter a postcode or start typing your street address, then select the full service address from the suggestions. A postcode alone does not allow you to continue. Confirm the suitable service and appointment details before continuing to Booking.

Further reading: Mira: electric shower replacement considerations.

For related work, see Local Gas London electric shower and water heater installation. Confirm the scope when booking.

Browse all articles

Manufacturers

  • Worcester Bosch
  • Vaillant
  • Viessmann
  • Ideal Heating
  • Baxi
  • Glow-worm