Should a bathroom fitter choose an electric shower before electrical assessment?

Coordinate shower choice with the installer assessment

Coordinate product choice with the installer who will assess the electrical and water requirements. Choosing a unit first can constrain the work or create avoidable replacement costs.

Settle product requirements before tiling and ordering

Share preferred models, the existing appliance details and the refurbishment plan. Ask which requirements must be established before ordering. Keep tiling and electrical responsibilities explicit so a visually finished bathroom is not left waiting for an incompatible shower to be resolved.

Details to prepare before arranging the visit

  • Preferred shower models and the existing appliance details.
  • The bathroom refurbishment plan.
  • Which installer establishes requirements and who handles tiling and electrical work.

Choose the appropriate next step

Agree the product-assessment and ordering sequence with the relevant trades before the bathroom is finished around a selected shower.

Further reading: Mira: electric shower replacement considerations.

For related work, see Local Gas London electric shower and water heater installation. Confirm the scope when booking.

Browse all articles

Manufacturers

  • Worcester Bosch
  • Vaillant
  • Viessmann
  • Ideal Heating
  • Baxi
  • Glow-worm