Why ask about inhibitor after a heating system has been drained?

Include treatment checks after draining

Draining and refilling can change the system's treatment condition. Ask the engineer what needs checking and restoring as part of the completed work.

Keep the repair and existing-treatment record

Keep the repair or radiator-replacement record and the name of any existing treatment if known. Do not assume the previous dose remains appropriate after water has been removed, and do not add an arbitrary amount yourself.

Document testing, additions and the next check

Request documentation of any testing and product added. Ask when the next check is due under the maintenance plan. This connects a small repair to the wider system's care rather than treating water treatment as relevant only during boiler installation. The final record should distinguish “system refilled” from a confirmed assessment of its ongoing protection.

Details to share about this work

  • The draining, repair or radiator-replacement record.
  • The name of existing treatment, if known.
  • Any test, product addition and future maintenance check documented by the engineer.

Arrange the appropriate next step

Ask for the refilling and water-treatment assessment to be recorded as distinct parts of the completed heating work.

Related Local Gas London service: central heating maintenance; heating water treatment and cleaning.

Further reading: Fernox: testing heating water; Fernox: water treatment guidance.

Browse all articles

Manufacturers

  • Worcester Bosch
  • Vaillant
  • Viessmann
  • Ideal Heating
  • Baxi
  • Glow-worm