Can a new shelf be installed above a gas fire using a standard height?

Use the fire's specified shelf arrangement

Use the exact fire manufacturer's requirements for a shelf or mantel, rather than a standard dimension copied from another fireplace. Materials and projections can affect the permitted arrangement.

Show the proposed materials and dimensions

Show the installer the proposed shelf's dimensions, finish and position before drilling. Ask whether it preserves servicing access and any requirements associated with the fire's approved front.

Retain the agreed clearance information

If the appliance cannot be identified, arrange a survey first. A shelf that looks well above the flames can still conflict with model-specific instructions. Retain the agreed specification so later changes are checked against the same appliance information.

Arrange the appropriate next step

Have the proposed shelf position and dimensions checked against the identified fire before drilling or fitting. Ask for any access or clearance constraint to be explained.

Check availability for your property by selecting its full service address from the address suggestions. A postcode-only entry does not allow you to continue to booking.

Source guidance: Stovax and Gazco: user guides and technical information.

Related Local Gas London service: site survey and advice.

Browse all articles

Manufacturers

  • Worcester Bosch
  • Vaillant
  • Viessmann
  • Ideal Heating
  • Baxi
  • Glow-worm