What paperwork should I send before a capped-supply appointment?

Send the full report that led to the gas supply being capped before arranging the next visit. Warning notices and follow-up instructions help the attending engineer understand what must be investigated before restoration can be considered.

For Local Gas London capped-supply reconnection assessment options, select the complete service address from the suggestions and review the scope. Supply the isolation and later repair reports first; an assessment booking does not guarantee that reconnection will be appropriate at that visit.

When arranging the separate visit described above, search by postcode or start typing the property address, then select the full address from the suggestion list before continuing.

Identify the isolation and later completed work

Include the property address, date of isolation and any repair work completed since. State whether the whole supply or one appliance is affected if the report makes that clear; do not guess from the fact that several appliances stopped working.

Provide readable documents without disturbing connections

Photographs of paperwork are useful if every page is readable. Avoid opening meter connection components or moving equipment to take a photograph of the cap. If the written description is unclear, ask the issuing organisation to explain it.

Agree the stages and keep the resulting reports

Agree the scope of the next visit before booking. A repair, inspection and reconnection may involve different steps. Keep all reports together afterwards so the final outcome can be understood without relying on a series of remembered telephone conversations.

Source guidance: SGN: what to do if you smell gas; HSE: gas safety for homeowners.

Related Local Gas London service: capped gas supply reconnection assessment.

Browse all articles

Manufacturers

  • Worcester Bosch
  • Vaillant
  • Viessmann
  • Ideal Heating
  • Baxi
  • Glow-worm